Latest Nigerian News|Football updates|9ja celebrity news|international news|


Spread the love

Governor of Lagos State, Mr Babajide Sanwo-Olu today commissioned the Ijede Road (Itamaga to Ewu Elepe), Phase 1 in Ikorodu Local Government.

Project Brief:

  • Date of Award: January, 2020
  • Length of Road: 6.05km
  • Carriageway Width (Dual): 14.6m
  • Surfacing with Interlocking stones
  • Pavement Marking and Kerb painting
  • Provision of Streetlights
  • Construction of Drainage and Culverts

The Rehabilitation of the Ijede Road (Phase 1) into a Dual Carriageway will:

  • Improve road connectivity.
  • Increase socio-economic activities
  • Reduced travel time.
  • Enhance Intermodal Transportation Services
  • Eliminate perennial flooding.
  • Enhance Property Values and Socio-economic well-being of the people.

ForAGreaterLagos

SanwoReporte

Leave a Reply

Your email address will not be published. Required fields are marked *

Copyright © 2019 - | CeenoMedia

Skip to toolbar